+86 400-6822512

English(默认)中文(简体)FrançaisРусский

+86 400-6822512

info@website.com
获取报价

立即获取您的免费报价

1
1

Grinding wastewater treatment equipment

请求查询

The grinding wastewater treatment equipment project mainly includes three links: wastewater collection, wastewater treatment and wastewater discharge. In terms of wastewater collection, it is necessary to collect and separate the wastewater generated during the grinding process for subsequent treatment. In terms of wastewater treatment, it is necessary to use appropriate treatment equipment, such as physical and chemical treatment equipment, to treat the wastewater and remove pollutants such as suspended matter, organic matter, and heavy metals to meet national emission standards.

请求查询

联系我们

  • 广东百汇普环保节能发展有限公司
  • +86 400-6822512baihuipu20@gmail.com
  • 广东省东莞市东城街威民路40号2栋102室