+86 400-6822512

English(默认)中文(简体)FrançaisРусский

+86 400-6822512

info@website.com
獲取報價

立即獲取您的免費報價

1
1

Grinding wastewater treatment equipment

請求查詢

The grinding wastewater treatment equipment project mainly includes three links: wastewater collection, wastewater treatment and wastewater discharge. In terms of wastewater collection, it is necessary to collect and separate the wastewater generated during the grinding process for subsequent treatment. In terms of wastewater treatment, it is necessary to use appropriate treatment equipment, such as physical and chemical treatment equipment, to treat the wastewater and remove pollutants such as suspended matter, organic matter, and heavy metals to meet national emission standards.

請求查詢

聯繫我們

  • 廣東百匯普環保節能發展有限公司
  • +86 400-6822512baihuipu20@gmail.com
  • 廣東省東莞市東城街道維民路40號2棟102室